« Score!!! | Main | I was right! »

Frelling delays...

My laptop has been backordered. I'm so pissed. I should have known though, when I got in touch with my sales rep yesterday, and he said that it was the absolute last one they had in their warehouse, and he hoped they could find the right box. I think he was giving me a warning, as best as he could.

I emailed him this morning, because I'm concerned that Toshiba has stopped making them. Asked him to give me an ETA, if he could.

I may try to talk Lou into taking me to CompUSA tomorrow. According to their website, they have the high end laptop model available in both of the stores local to us. It'd mean overall about $150 more, with tax added on top of that. No shipping, but I wasn't having it overnighted, so shipping wasn't as much as tax'll be.

If they have discontinued it (I really should email Toshiba), then I may just go to CompUSA and get the high-end model. That does it, I'm emailing Toshiba.

About

This page contains a single entry from the blog posted on January 18, 2002 9:48 AM.

The previous post in this blog was Score!!!.

The next post in this blog is I was right!.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.33